![]()
Clik a title !↓
①Meeting
Meeting with the visitor.
We answer a demand!
Please order a demand, hope of a visitor in anything willingly.
②Design
Method of construction suggestion, specifications decision
Our company answers it quickly!
Our company examines a method of construction and specifications for the cause by the information that visitor gave to me. Because I send a temporary figure (a figure of Class die, a figure of matching, a figure of layout) from our company, after examination, I suffer from die production after confirmation.
③Die detached view /CAM making
Die detached view /CAM making

We make a die detached view, CAM data.
![]()
Clik a title !↓
④MC processing
Machining center processing
We fix the operation system for 24 hours.
MC performs processing before the quenching of the die part mainly.Because I possess a palette change, I can answer sudden correspondence flexibly.
⑤WC processing
We prepare the latest wire electric discharge method machine.
This performs processing after the quenching of the die part and stands by by five regular systems.Because this is one in the decisive factor of the die precision, I include we original know-how and process it.
⑥Abrasion processing
![]()
Clik a title !↓
⑦The assembling
The assembling of the die
We have the best staff!
The finish craftsman of our best revises few tallies of the die part and stencils it and performs a die or the polishing of the punch.And I assemble a die.
⑧The trial
The trial manufacture of the die
Our press can perform a try of the environment same as a visitor in us.
After die completion, I try it in we latest SERVO Press(250t).It is correct and can perform confirmation or the die operation check of product dimensions speedily by setting it.In addition, please use it because I can measure the press weighting. (The trial manufacture press has 80t else, 200t.)
Clik !
⑨Delivery of goods
Delivery of goods
If there is a demand, I call at the delivery of goods back anytime!
I am absolutely sure to we die, but don't worry by any chance if there are problems because we staff copes quickly!

